templates

Notes Documentation

🗒 Notes & Documentation

Detailed notes of work completed is mandatory. Your notes serve as the official record of service, the summary of discussions, and the client’s receipt.


Documentation Guidelines

  • Note Apps: Use a reliable note app like Microsoft OneNote, Samsung Notes, or Notion to track job details.
  • Mandatory Summary: A full detailed report is not needed. A basic summary including important points/details is all that is required and is mandatory.

What to Include in Your Notes:

  1. Client/Location Details: Client name, date, time in/out, address, and residency type.
  2. Work Summary (What was done): A concise, itemized list of every task completed (e.g., “Start-up Optimized,” “Junk file cleanup”).
  3. Findings & Issues: Any critical discoveries (e.g., “3 PUPs removed,” “No backup system found”).
  4. Client Discussion: What was explained to or discussed with the client (e.g., “Discussed cloud backup options,” “Referred to BackBlaze”).
  5. Billing Breakdown: A clear, step-by-step breakdown of all charges and payment details.

Example Job Report

This example shows the mandatory level of detail required for a security cleanup job.

```markdown Joe Doe 6-24-24 11:00 AM - 12:22 PM 111 W Main St, Battle Ground, WA (Home Residence)

Work Completed:

  • Broken ethernet cable, installed new 6ft Cat5 cable ($12)
  • Junk file cleanup (Done)
  • Start-up Optimized (Done)
  • Paging file (Done)
  • MBAM Installed (Done) Scans = 3 threats (1 Adware, 2 PUPs: MapsGalaxy and OneSearch)
  • BBit = 1.4GB Removed
  • Ninite/App Updates = 4 Updated (Java, Adobe, .Net, Chrome)
  • Windows Updates = Up to Date; 22H2 set to download/install automatically.

System Health & Notes:

  • HDD/SSD Health = 90% (Some relocated sectors, but no pending sectors or relocation errors)
  • NO DATA BACKUP SETUP/SYSTEM FOUND; discussed local and cloud backup options and referred them to BackBlaze (https://www.backblaze.com/)

Billing Breakdown:

  • Total Time = 1 hour 22 minutes (1.36 hours)
  • Labor: 1.36 hrs x $100/hr = $136.00
  • Parts: 6ft Cat5 Cable = $12.00
  • Subtotal (Labor + Parts): $148.00
  • Taxes (8.8%): $12.88
  • Subtotal w/ Taxes: $160.88
  • Trip Fee: $20.00
  • Grand Total: $180.88 (Includes trip fee and taxes)
  • Paid via: Square with Credit Card - Receipt #D5yf